Final tests and control
In order to ensure a continuous quality, SOREEL sets up tests and control phases which consists of :
- systematically control the preceeding activities of the production
- parameterize the adjustable components
- validate the design
- manage the reception with the customer under control of the project manager
In order to proceed with those tests, SOREEL has the human means and powerful technics :
- 10 controllers
- a surface of 300 m2
- measuring devices
- dielectrimetre of 15kV
- generator of frequency, tension, electric current
- simulators